How to Make a Kanban Board in Excel and Google Sheets
A kanban board in Excel is a task list with a Status column and a board view that shows each task under its stage. Here is how to build one two ways (a simple drag-the-cells board and a formula board that updates itself), how to add WIP limits, due-date colors and cycle time, and a calculator that tells you how long work will take at your current pace.
THE SHORT ANSWER
A task table, a Status dropdown and one formula per column
Keep every task in one table with a Status column (To do, In progress, Review, Done). Build the board on a second tab: each board column uses FILTER to list the tasks whose status matches its header. Change a task's status in the table and the card moves on the board by itself. Add a count above each column to enforce a work-in-progress (WIP) limit, color cards that are overdue, and log a start and finish date so the sheet can show how long tasks really take.
STEP 1
Set up the task table
On a tab called Tasks, create these headers in row 1 and convert the range to a table (Excel: Ctrl+T, name it Tasks in Table Design; Google Sheets: Format › Convert to table). A table makes new rows pick up formulas, dropdowns and formatting automatically.
| Column | Contents | How to set it up |
|---|---|---|
| A. ID | T-001, T-002… | Optional, helps when two tasks have similar names |
| B. Task | Short card title | Start with a verb: "Draft January newsletter" |
| C. Status | To do, In progress, Review, Done | Dropdown (Excel: Data › Data Validation › List; Sheets: Insert › Dropdown) |
| D. Owner | Who is doing it | Dropdown from a list of names |
| E. Priority | High, Medium, Low | Dropdown; drives the card color |
| F. Due | Due date | Date format, so overdue checks work |
| G. Started | Date it moved to In progress | Type the date, or Ctrl+; (Excel and Sheets) for today |
| H. Done | Date it moved to Done | Same shortcut; leave blank until finished |
| I. Tag | Project or client | Lets you filter the board per project |
METHOD 1
A manual board: cells as cards
The quickest version has no formulas at all. Type the stage names across row 1 of a new tab (To do in A1, In progress in B1, Review in C1, Done in D1), widen the columns to about 30 characters, turn on Wrap text and give each column a light fill color. Each task is one cell under its stage.
- 1
Add cards
Type a task into the first empty cell of To do. Put the owner or due date after a dash in the same cell: "Update price list – Ana – Dec 4".
- 2
Move a card
In Excel, select the cell, point at its border until the move cursor appears and drag it to the next column. In Google Sheets, select the cell and drag it by its edge. Hold Shift while dragging in Excel to insert it between cards instead of overwriting one.
- 3
Freeze the headers
View › Freeze › 1 row keeps the stage names visible as the columns grow.
This works for a personal board with up to a few dozen cards. Its limit is that the data lives only in the board, so you can't sort, filter by owner or measure how long anything took. For that, use the formula board.
METHOD 2
A formula board that moves cards for you
On a tab called Board, type the stage names in B2:E2 exactly as they appear in the Status dropdown. Then put one formula under each header in row 4 and copy it across. Excel and Google Sheets need slightly different versions:
| What | Formula (in B4, copied to C4:E4) |
|---|---|
| Excel 2021 / 365 / web | =FILTER(Tasks[Task],Tasks[Status]=B$2,"") |
| Google Sheets | =IFERROR(FILTER(Tasks!B2:B,Tasks!C2:C=B$2),"") |
| Sorted by due date (Excel) | =SORTBY(FILTER(Tasks[Task],Tasks[Status]=B$2,""),FILTER(Tasks[Due],Tasks[Status]=B$2,""),1) |
| Sorted by due date (Sheets) | =IFERROR(SORT(FILTER({Tasks!B2:B,Tasks!F2:F},Tasks!C2:C=B$2),2,TRUE),"") |
| Card with owner and date (Excel) | =FILTER(Tasks[Task]&" · "&Tasks[Owner]&" · "&TEXT(Tasks[Due],"mmm d"),Tasks[Status]=B$2,"") |
| Only one project (tag in B1) | =FILTER(Tasks[Task],(Tasks[Status]=B$2)*(Tasks[Tag]=$B$1),"") |
FILTER spills down as many rows as there are matching tasks, so leave the cells below each formula empty. The Sheets "sorted" version returns two columns (task and date); leave an empty column between stages, or use the single-column version. Changing a task's status in the table moves its card on the next recalculation. In Excel versions without FILTER (2019 and older), a pivot table with Status in Columns and Task in Rows gives a similar board you refresh with one click.
WIP LIMITS AND COLORS
WIP limits, overdue cards and priority colors
A WIP limit is the most useful thing a kanban board adds to a to-do list: a maximum number of cards allowed in a stage, so new work waits until something finishes. Put the count in row 3 under each header and the limit in a cell next to it.
| What | Formula or rule |
|---|---|
| Cards in a stage (B3) | =COUNTIF(Tasks[Status],B$2) (Sheets: =COUNTIF(Tasks!C2:C,B$2)) |
| Header turns red over the limit (limit in B1) | Conditional formatting on B2, custom formula =B$3>B$1 |
| Overdue task row in the table | Custom formula on the table range =AND($F2<>"",$F2<TODAY(),$C2<>"Done") |
| High priority in bold red | Custom formula =$E2="High" |
| Days left until due | =IF(OR([@Due]="",[@Status]="Done"),"",[@Due]-TODAY()) |
What limit to start with? A common rule of thumb is about one or two cards in progress per person. Watch the board for a few weeks: if cards pile up in Review, lower the In progress limit so people help finish reviews instead of starting new work.
FLOW METRICS
Cycle time and throughput in a spreadsheet
The Kanban Guide names four flow metrics. With the Started and Done dates in the table, a spreadsheet can calculate all of them. Formulas with [@Column] are Excel table syntax and go in a new table column; in Google Sheets use the row's cells instead, for example =IF(H2="","",H2-G2+1) for cycle time.
| Metric (Kanban Guide definition) | Formula |
|---|---|
| WIP: items started but not finished | =COUNTIFS(Tasks[Started],"<>",Tasks[Done],"") |
| Throughput: items finished per unit of time (week starting in K1) | =COUNTIFS(Tasks[Done],">="&K1,Tasks[Done],"<"&K1+7) |
| Work item age: time since an unfinished item started | =IF(OR([@Started]="",[@Done]<>""),"",TODAY()-[@Started]) |
| Cycle time: time from start to finish | =IF([@Done]="","",[@Done]-[@Started]+1) |
| Average cycle time, last 30 days | =AVERAGEIFS(Tasks[Cycle],Tasks[Done],">="&TODAY()-30) |
The guide counts cycle time from the moment work started to when it finished; the +1 counts a task started and finished on the same day as one day, a common convention. The three metrics are tied together by Little's Law: on average, cycle time = WIP ÷ throughput. That's why WIP limits work: with the same team finishing the same number of tasks a week, fewer tasks in progress means each one finishes sooner.
KANBAN FLOW CALCULATOR
How long will your tasks take?
LITTLE'S LAW
Cycle time, backlog and WIP limit
Count the cards in progress on your board and how many you finished in an average recent week. The calculator applies Little's Law to estimate how long a task takes, how long the backlog will take and what WIP limit would hit your target.
Little's Law describes averages in a stable system: tasks of mixed size, interruptions and changes in team size all add variation. Use it to compare scenarios, not to promise dates. Results stay in your browser.
With the defaults, 12 tasks in progress and 6 finished a week mean a task takes about 2 weeks (14 days) from start to finish. The 30 tasks in To do will take about 5 weeks to get through. To bring cycle time down to 7 days without working faster, the board can hold about 6 tasks in progress, 1.5 per person.
SPREADSHEET OR APP
When a spreadsheet kanban board is enough
| A spreadsheet works well when… | Consider a kanban app when… |
|---|---|
| You or a small team share one file | Many people need comments, mentions and notifications on each card |
| You want to see and change every formula and report | You want true drag-and-drop cards on a phone |
| You need cycle time, workload and project totals in one place | Cards need attachments, checklists and integrations with other tools |
| You don't want another subscription | You need permissions per board and an audit trail |
A spreadsheet board also pairs well with other trackers: our habit tracker in Google Sheets uses the same checkbox and conditional formatting tricks, and if a cluttered to-do list is the real problem, see how to stay organized with ADHD.
READY-MADE TEMPLATE
Skip the setup: a kanban board already built
If you'd rather not build the table, board and formulas yourself, our kanban template works in Excel and Google Sheets. Check the product page for the current feature list.
Kanban Board Spreadsheet Template for Google Sheets & Excel
The listing describes boards with owners, categories, tags and custom stages, up to 500 tasks per stage, statuses from Not Started to Completed and Cancelled, filters by owner, category, tag, priority or effort, a calendar view by year, month and owner, and automatic days left or overdue.
- Up to 500 tasks per stage
- Smart filters and calendar view
- Days left and overdue flags
Managing whole projects with timelines? The project management spreadsheet combines a kanban board with a Gantt chart and weekly planner, and the task tracker is a simpler list with a dashboard. Features and compatibility are listed on each product page and may change.
Planning posts rather than tasks? Use a social media content calendar in Excel with the same columns-and-status idea.
Want status and priority to be picked from a list instead of typed? Follow our lesson on how to make a drop-down list in Excel and Google Sheets.
To color each card row by its status column, use conditional formatting based on another cell (one custom formula, step by step).
FAQ
Kanban board in Excel questions
Can you make a kanban board in Excel?
Yes. Either type tasks into cells under stage columns and drag them between columns, or keep tasks in a table with a Status dropdown and use FILTER under each stage header so cards move automatically when the status changes.
Does Google Sheets have a kanban board?
Not as a separate view, but the same approach works: a task table with a status dropdown and IFERROR(FILTER(…)) under each stage header. Dropdown chips and checkboxes make it quick to update.
What columns should a kanban board have?
Most boards start with To do, In progress, Review and Done. Add a stage only when work really waits there, for example Waiting on client, and give In progress a WIP limit.
What is a WIP limit in kanban?
The maximum number of items allowed in a stage at the same time. When a stage is full, the team finishes or unblocks existing work before pulling new work in, which shortens how long each item takes.
How do you calculate cycle time in Excel?
Record the date a task started and the date it finished, then subtract: =Done−Started (+1 if you count a same-day task as one day). AVERAGEIFS over recently finished tasks gives the average cycle time.
Sources and method
- The Kanban Guide (May 2025), Kanban Guides (three practices; WIP, throughput, work item age and cycle time definitions)
- Microsoft Support: FILTER function
- Google Docs Editors Help: FILTER function
Method: average cycle time = WIP ÷ throughput (Little's Law), shown in days as WIP ÷ weekly throughput × 7; backlog time = backlog ÷ throughput; WIP limit for a target = throughput ÷ 7 × target days, rounded down. Example figures are illustrations. Checked November 21, 2026.